Picture
The good news is that our previously cancelled trip to tour the Riverbend Timber Frame facility is back on!   We packed the car, dropped Beau off at the sitter and headed west – sadly no RV or stop in Pittsburgh this time!  And, hopefully, no more fires!  RIverbend started working on our wood on Thursday and we found out that ours was the first wood to be cut since the fire.  Needless to say we believe our wood will be heavily scrutinized for accuracy!  Our tour starts Tuesday at 9:30 and we can’t wait!


 
Picture
No changes today, Saturday, but Lauren made a quick trip home for my brother, Don’s, wedding so we took her to Strasburg to see the progress in person.  Beau was in his glory bounding through the trees and chasing birds.  Lauren commented on how the height of the basement walls now make sense compared to those too short stakes that we used to mark the height of the first floor so many weeks ago with Dan T!


 
Picture
Another busy day at the home site!  The crane was gone and three new steel beams were installed.  The largest of the three beams runs the entire width of the entire house.  The second is across the great room and the third across our master bathroom.  These beams support the joists that in turn support the sub floor (these three elements make up the ‘plate’). In addition to the beams the main drain lines were installed and more grading was done for the RV garage which will be located at the northern edge of the property.


 
Picture
By the time we got to the site at lunch time on Monday, the Superior Wall wizards were once again there and gone.  This time they delivered and installed the garage footings. The installers were again measuring and doing the final adjustments.  We noticed that wood boards were being laid all along the top of the foundation walls.  Not sure why but we believe it is in preparation for installing the plate.  Dan M. met us at the site to discuss his suggestion that we add provisions for water and sewer at the lower level even though we won’t be finishing the basement.  The logic is that it is much easier and cost effective to do this now before the cement floor is poured rather than in the future.  So after much discussion (and cost analysis!) we decided to go ahead with their suggestion – another change order!


 
Picture
By the time Ralph got to the house around 10:30 am, gravel trucks were there and gone.  They dumped enough stone to fill the basement floor, completely covering the cement footers.  This stone plays a critical role in providing support to the Superior walls which were sitting on two large flat bed trucks.  The first truck had already backed down the makeshift driveway, waiting to be unloaded.   As Ralph walked towards the truck he couldn’t miss the huge crane firmly rooted to the ground close to the front of the house.  A word about Superior Walls… They are manufactured concrete basement wall sections reinforced with rebar, insulated and ready to have wall board installed on the interior walls.  They are made of high pressure concrete and require no additional water proofing.  Each piece is precisely measured and constructed to the builder’s specifications, ready to be lowered into place by one very talented crane operator.  As you will see in the pictures, the walls are manufactured with openings for the two doors and one window specified in the plans for our walk out basement.  Once in place, the wall pieces are bolted together and sealed.  Superior Walls were invented in Lancaster by a local builder in 1981 and are now distributed in 25 states.  (end of commercial!). 

Ralph went home eager to tell me all about his adventures and we made immediate plans to go back together to watch the walls be hoisted into place.  We made it back to the house by 3:00 and, much to our surprise, every single wall was in place and the trucks were gone!  The two installers were carefully measuring the position of each wall and on several occasions used the crane and the lift to adjust individual sections.  We were disappointed to miss the flying walls but thrilled to be able to walk around in what now really felt like a basement!  Everything seemed so much bigger once the walls were in place.


 
Picture
Once again we went down to the house at lunch time.  Boy, do these people work fast!  The basement was completely excavated and cement pads or “footers” were framed and filled with cement.  These footers are four foot by four foot cement pads (one foot deep!) that will support steel posts.  These posts which reach up and through the first floor ‘plate” are what the wood posts will then rest on.  Rather than just placing the wood posts directly on the plate or on the perimeter of the foundation, this method provides a much more rigid and secure support system.  Remember, in post and beam construction, it is the wood frame that supports the entire structure, not the walls which provide the support in regular ‘stick’ construction.  They also added an additional cement pad for extra support for the staircase. 


 
Picture
Dan M. said the crew got to our site later in the day on Monday which seems a bit strange since we were there around 3:00.  But, today is the day!  At lunch time we made a bee line to Strasburg and this time we found lots of activity!  The narrow path (our future driveway!) was widened and two large piles of stone were laid down to provide a more solid foundation for the heavy equipment.  The top soil had already been scraped off and was piled high in a big mound out of the way. A front end loader was busy scooping out dirt and distributing it to various parts of the property.  We could actually see the beginning of the basement!  A backhoe was digging out more of the driveway and doing some grading.  We later realized this was to create access for the flatbed trucks that would be delivering the Superior walls for the foundation.  To the untrained eye (mine) it look an awful lot like two grown men playing with their Tonka toys in the dirt! 

Our project manager, Ken, was on site so we had the opportunity to introduce ourselves and talk to him about the plans for the rest of the week.  We were mesmerized watching the process unfold.  Finally, it was beginning to seem real.  As much as we wanted to stay and keep watching, it was time to go back to work.  We all but bounced back to the car, grinning from ear to ear!  What a rush!

 
Picture
The one advantage of our trip being cut short is being able to see the builder break ground.  We were resigned to missing this moment so we were really excited!  Finally, after all these months of planing and talking, Today is the day we would actually have a hole in the ground!  After unpacking the RV and taking it back to Mt. Joy, we hurried down to Strasburg full of anticipation.  But, alas, disappointment one more time!  There was not a woker to be seen and the one piece of construction equipemnt was just sitting there looking lonely!  Time to call Dan M. to find out about the delay! 

 
Picture
Each time we visited a Riverbend home the owners encouraged us to make a trip to Riverbend to watch the production of our timbers.  With Dan T.'s help we scheduled our visit to coincide with the manufacture of our timber which (finally) was scheduled to begin on Monday, October 11th.  The process takes a little over a week so we planned our visit for Monday, October 18th.  Since the trip was about 493 miles we decided to include a stop in Pittsburgh to visit Lauren.  We packed up our RV and headed to Pittsburgh on Thursday, October 14th excited to see Lauren and our 'wood'! 

We had a great visit with Lauren until my phone rang on Saturday morning.  Riverbend's General Manager was calling to tell us they had had an extensive fire in their production area early that morning.  Fortunately, no one was hurt AND our wood safe!  Dan later told us if the fire had been one day later our timber would have been moved to the area that was destroyed.  Whew, what a relief!  Needless to say our trip to Michigan was off.  On Sunday we packed up the RV and headed home, disappointed and unsure if we would have the opportunity to reschedule our visit.