Picture
Another busy day at the home site!  The crane was gone and three new steel beams were installed.  The largest of the three beams runs the entire width of the entire house.  The second is across the great room and the third across our master bathroom.  These beams support the joists that in turn support the sub floor (these three elements make up the ‘plate’). In addition to the beams the main drain lines were installed and more grading was done for the RV garage which will be located at the northern edge of the property.