By the time we got to the site at lunch time on Monday, the Superior Wall wizards were once again there and gone.  This time they delivered and installed the garage footings. The installers were again measuring and doing the final adjustments.  We noticed that wood boards were being laid all along the top of the foundation walls.  Not sure why but we believe it is in preparation for installing the plate.  Dan M. met us at the site to discuss his suggestion that we add provisions for water and sewer at the lower level even though we won’t be finishing the basement.  The logic is that it is much easier and cost effective to do this now before the cement floor is poured rather than in the future.  So after much discussion (and cost analysis!) we decided to go ahead with their suggestion – another change order!