Home
Our Blog
Our Pictures
Pictures 2/12/10 to 11/6/10
>
And it Begins... (2/12/10)
It's Official (5/27/10)
Staking the House (6/17/10)
Preparing the Site (10/11)
Clearing the Land (10/13)
Time to Move Some Dirt (10/15)
No More Tree Stumps (10/17)
Digging the Foundation (10/19)
Pouring the Cement Footings (10/20)
Installing the Foundation Walls (10/22)
Garage Walls (10/25)
Steel Support Beams (10/29)
Lauren Home for Don's Wedding (10/30)
Our Visit to Riverbend Timber Frame (11/2)
We Have a Basement (11/3)
The Plate is Done (11/5)
The Garage & Backfilling (11/6)
Pictures 11/9/10 to 12/31/10
>
Our Wood Arrives! (11/9)
Raising the Timbers (11/10)
SIPs Arrive & the Frame is Finished (11/11)
Installing the SIPs (11/12)
More SIP's (11/15 to 11/17)
Interior Walls & Second Floor (11/18-19)
The View From our Second Floor (11/24)
Second Floor Over the Garage (11/29)
The Roof Begins (12/4)
The Prow is up and More Roof (12/7-12/9)
The Roof is Finished (12/11)
Widows and Snow (12/16-12/17)
RV Garage Foundation & SIPS (120/19)
Shingles & Interior Walls (12/21)
Chimney, Complete Roof & RV Foundation (12/22)
Getting Ready for Snow & Snow (12/26-29)
Happy New Year (12/31)
Pictures 1/3/11 to
>
Electric, Plumbing & Garage Floor (1/3-4)
RV Garage Takes Shape (1/6, 1/15, 1/20, 1/28, 2/1, 3/1, 3/20)
Plumbing, Electric & HVAC (1/7-9)
Drilling the Wells for Geo-thermal 1/12
Digging Trenches & After (1/17-19)
The Fireplace is Framed (1/18-19)
Drywalling (1/24-
We Have Stairs, Finally! & Snowstorm (1/27)
Cedar Siding (1/28, 2/7 - 2/16, 3/20 - 3/25, 4/1)
Interior Finishes (2/14-
Road Trip to Conestoga Country Kitchens (2/23, 3/1)
HVAC - PHD required! 2/25, 3/1
Digging a Trench to the RV Garage for Conduit (3/1 -2)
Installing Stone on the Exterior (3/20 - 3/26)
Excavation and Building a Rock Wall (3/25 - 3/28)
Building the Patio & Pergola (3/30 -
Excavating for the Septic System & Driveway
What is Timber Framing?
Our Partners
Building our Timber Frame Home